購買設(shè)計(jì)請充值后下載,,資源目錄下的文件所見即所得,都可以點(diǎn)開預(yù)覽,,資料完整,充值下載可得到資源目錄里的所有文件。。。【注】:dwg后綴為CAD圖紙,doc,docx為WORD文檔,原稿無水印,可編輯。。。具體請見文件預(yù)覽,有不明白之處,可咨詢QQ:12401814
車載機(jī)械自動(dòng)調(diào)平機(jī)械系統(tǒng)設(shè)計(jì)與開發(fā)
摘 要
本論文的題目是車載機(jī)械自動(dòng)調(diào)平機(jī)械系統(tǒng)設(shè)計(jì)與開發(fā)。論文分為選題背景、方案論證、過程論述、結(jié)論總結(jié)四大部分。
選題背景部分,我主要講述了本設(shè)計(jì)課題的來源、目的、意義、應(yīng)解決的問題及應(yīng)該達(dá)到的技術(shù)要求和介紹系統(tǒng)其它結(jié)構(gòu)。還簡述了本課題在國內(nèi)外的發(fā)展概況,為設(shè)計(jì)提供了指導(dǎo)思想。
方案論證部分,我按照技術(shù)要求,對液壓系統(tǒng)進(jìn)行了分析,并設(shè)計(jì)了一套液壓控制系統(tǒng)。
過程論證析部分,我考慮了整個(gè)雷達(dá)受到本身重力和風(fēng)力的影響,為了保證力學(xué)穩(wěn)定性,使用了塔架桿來支撐主升油缸。我綜合考慮了液壓缸舉升的高度和缸需要提供的動(dòng)力,結(jié)合工作環(huán)境,從而選擇了四級液壓缸作為主升油缸。液壓缸舉升1.5噸的雷達(dá)和1.5噸的塔架,再加上受風(fēng)力的影響,這對主升油缸的強(qiáng)度提出了要求,本部分通過計(jì)算可以確定滿足強(qiáng)度要求的缸的內(nèi)外徑。塔架設(shè)計(jì)部分,設(shè)計(jì)了塔架三節(jié)每節(jié)的尺寸,以及塔架各節(jié)的連接。
設(shè)計(jì)總結(jié)部分,我對本次設(shè)計(jì)過程進(jìn)行了深刻的總結(jié),為自己所學(xué)到了系統(tǒng)的分析問題而高興,再次感受那些思考問題的過程與方法。
關(guān)鍵詞:四級液壓缸;雷達(dá);設(shè)計(jì);自動(dòng)調(diào)平系統(tǒng)。
Abstract
The topic of my paper is vehicle-mounted machine automatically transferred Ping mechanical systems design and development. This paper is divided into four parts: selection of subjects background, programme appraisal, process expositions, conclusions summarized
Selection of subjects background part, I described the main source of design topics, objectives, significance, and should be addressed to the technical requirements and other structures on the system. Also on the topic of development profile at home and abroad, providing guidance for the design ideas. Because the whole radar antenna will be affected by the weight and wind, in order to make sure the mechanics stability, then the solution is by using tower frame pole to support the main promoting cylinder. The second part is just the analyses on the mechanics capability of the tower frame pole.
Programme appraisal part of the question, I analysed the hydraulic system in accordance with the technical requirements, and to design a set of hydraulic control systems.
Analysis of the process of verification part, I consider the entire radar by itself gravity and wind effects. In order to ensure the stability of mechanics,I use the tower to support the main hydraulic cylinder. On the part of the mechanics tower pole performance analysed.I integrated into the hydraulic cylinder up-down and hydraulic cylinder need to provide the high momentum in the work environment, thus chosen as a main or 4 hydraulic cylinder. 1.5 tons of hydraulic cylinder up-down radar and 1.5 tons town coupled with the impact of the wind, which the intensity of the fuel hydraulic cylinder or the demands of this segment by calculating the intensity can meet the requirements of main hydraulic cylinder. In the conclusion, I give a thorough summing-up of the process of my project. I feel pleased that I have learned to analyze problem generally, and have reconsidered the methods and process of my project. Tower design part, I use the second part of the contents , designed tower section three dimensions, and the tower sections connected.
In the conclusion, I give a thorough summing-up of the process of my project. I feel pleased that I have learned to analyze problem generally, and have reconsidered the methods and process of my project.
Key word: triple-level hydraulic cylinder ;design ;Radar;automatically leveling system.
III